(SEI) Solaris Energy Infrastructure, Inc. Company Overview

US | Energy | Oil & Gas Equipment & Services | NYSE

What does Solaris Energy Infrastructure do?

Solaris Energy Infrastructure, Inc. is a New York Stock Exchange company trading as SEI. It began as an oilfield logistics specialist, but its current identity is broader: it supplies modular equipment and operating services for power generation, power control and distribution, and raw-material handling at oil and natural gas well sites. The company’s official company overview emphasizes data centers, energy, commercial, and industrial customers, while the 2025 Form 10-K describes two reportable segments.

$196.2M
Q1 2026 revenue
$83.6M
Q1 2026 adjusted EBITDA
910 MW
Average capacity earning revenue, Q1 2026
3.1 GW
Expected generation capacity by end-2029

What the two segments actually sell

Solaris Power Solutions
Generation equipment, balance-of-plant assets, control and distribution systems, installation support, and long-duration equipment rentals. The power platform is aimed at customers that need reliable capacity faster than a conventional grid interconnection can provide.
Solaris Logistics Solutions
Proprietary proppant-management systems, field technicians, software, maintenance, mobilization, and last-mile services for well completions. The logistics offering seeks to reduce truck congestion, handling time, and nonproductive time at the well site.
Identity item Current position Analytical relevance
Listing NYSE: SEI Public-market access supports a capital-intensive fleet expansion.
Headquarters Houston, Texas Places Solaris near energy customers, suppliers, and technical labor.
Primary end markets AI data centers, energy, commercial and industrial power, U.S. well completions Diversification is increasing, but customer and project concentration remain material.
Business model Equipment rental, service revenue, and bundled operating support Revenue durability depends on utilization, contract tenor, uptime, and disciplined asset financing.

Why Solaris matters is the speed of its strategic transition. Power Solutions generated 65% of Q1 2026 revenue and 76% of total segment adjusted EBITDA, making the former oilfield-adjacent business increasingly a distributed-power infrastructure company.

How does Solaris make money across power and logistics?

Solaris earns leasing revenue when customers rent generation or related equipment and service revenue when Solaris operates, supports, transports, maintains, or otherwise manages equipment and workflows. Q1 2026 leasing revenue was $105.4 million and service revenue was $90.9 million. That 54%/46% split is important because leasing can create contracted, asset-backed cash flows, while services can deepen customer integration but carry labor, transportation, and project-mix variability.

Revenue by type — Q1 2026
Leasing — $105.4M, 53.7%
Services — $90.9M, 46.3%
The mix shows that Solaris is not simply selling equipment; it monetizes deployed assets over time and adds operating services around them.

Which segment is now the economic engine?

Segment revenue — Q1 2026
Power Solutions$128.5M
Logistics Solutions$67.7M
Power represented 65.5% of Q1 2026 revenue and was 1.9 times the size of Logistics revenue.
Revenue mechanism Economic driver Margin or cash-flow implication
Power equipment rentals MW deployed, contract price, contract tenor, uptime High upfront capital; attractive economics require utilization over multi-year terms.
Power services and balance of plant Installation scope, operating services, maintenance, distribution complexity Expands wallet share and can improve lifecycle returns without relying only on generator ownership.
Logistics system revenue Fully utilized systems, customer activity, pricing and project mix Mature fleet can produce cash with comparatively modest maintenance capital.
Last-mile and mobilization services Tonnage, distance, trucking intensity, labor and fuel Adds revenue but is more variable and can dilute margins when transportation intensity rises.

What does the latest quarter reveal about Solaris’s earnings mix?

The Q1 2026 earnings release and Form 10-Q show a business growing faster than its legacy label suggests. Revenue reached $196.2 million, up 55% from $126.3 million in Q1 2025 and 9% from $179.7 million in Q4 2025. Operating income was $50.6 million, implying a 25.8% operating margin. Consolidated net income was $32.1 million, and net income attributable to Solaris was $21.4 million.

$50.6M
Operating income, Q1 2026
25.8%
Operating margin, Q1 2026
$32.1M
Consolidated net income, Q1 2026
$0.32
Diluted Class A EPS, Q1 2026

The latest income statement signal

Metric Q1 2026 Q1 2025 Interpretation
Revenue $196.2M $126.3M Growth was driven primarily by Power Solutions capacity.
Operating income $50.6M $22.1M Operating profit more than doubled as Power scaled.
Net income $32.1M $13.0M The consolidated result includes non-controlling interests.
Adjusted EBITDA $83.6M $46.9M Non-GAAP profitability rose 78% year over year.
Operating cash flow $79.0M $25.7M Deferred revenue helped cash generation in the period.
42.6%
Adjusted EBITDA margin, Q1 2026. Adjusted EBITDA of $83.6 million divided by $196.2 million of revenue. The measure is useful for operating comparison, but it excludes depreciation, financing, taxes, stock compensation, and selected items.

Which operating KPIs moved?

Power averaged about 910 MW earning revenue, up 17% sequentially from 780 MW in Q4 2025. Power revenue increased 24% sequentially to $128.5 million, and Power segment adjusted EBITDA rose 34% to $71.9 million. Logistics reached 104 fully utilized systems, up 12% sequentially, yet its revenue fell 11% to $67.7 million because last-mile transportation activity declined. This divergence shows why system count alone is insufficient: researchers must also track service mix and revenue per active system.

Quarterly revenue trend — Q1 2025 to Q1 2026
$126.3MQ1 25
$149.3MQ2 25
$166.8MQ3 25
$179.7MQ4 25
$196.2MQ1 26
Revenue advanced each quarter across this five-quarter sequence as power capacity entered service.

How did Solaris pivot from oilfield logistics to AI power infrastructure?

Solaris’s strategic history follows a sequence of equipment bottlenecks. It first addressed inefficient proppant handling, then applied the same modular-equipment and service logic to power shortages. Logistics remains, but capital allocation has shifted toward the larger contracted power opportunity.

  1. 2014
    Solaris was founded around specialized oilfield logistics equipment and operational execution.
  2. 2017
    The IPO created a public equity currency and broader financing access for fleet investment.
  3. Sep. 2024
    The Mobile Energy Rentals acquisition established Power Solutions; the company renamed itself Solaris Energy Infrastructure.
  4. 2025
    A seven-year arrangement for up to roughly 900 MW created Stateline Power, owned 50.1% by Solaris and 49.9% by the customer.
  5. Aug.–Oct. 2025
    HVMVLV added control and distribution capabilities; Amanda Brock became Co-CEO, strengthening the power-focused leadership structure.
  6. Feb.–Apr. 2026
    Solaris signed separate ten-year agreements for more than 500 MW and more than 600 MW with affiliates of investment-grade global technology companies.
  7. Mar. 2026
    Genco and NovaLT16 transactions added a planned 900 MW and lifted expected generation capacity to about 3.1 GW by end-2029.
  8. Jul. 2026
    The GESA acquisition, funded with about $55 million of cash and roughly three million Class A shares, added installation, commissioning, operations, maintenance, and global aftermarket capabilities.
Solaris’s defining strategic shift is from solving a well-site logistics bottleneck to solving a power-availability bottleneck, while preserving the same equipment-plus-service operating logic.

What did the pivot change financially?

In FY2025, total revenue was $622.2 million, up 99% from $313.1 million in FY2024. Power Solutions contributed $333.5 million, or 54%, while Logistics contributed $288.7 million. Power also supplied 68% of total segment adjusted EBITDA. Capital followed the earnings opportunity: FY2025 capital expenditures were $646.8 million, with only $7.0 million attributed to Logistics and the great majority directed to Power. That mismatch—Power absorbing almost all growth capital while Logistics supplies mature cash flow—is the core portfolio logic.

Why is Solaris Power Solutions strategically differentiated?

Solaris’s proposition is time, reliability, modularity, and integration—not universally cheaper power. A hyperscale data center may value faster energization because delayed compute capacity carries a high opportunity cost. Solaris can deploy behind-the-meter generation while grid access is delayed and bundle it with distribution, commissioning, and lifecycle maintenance.

The power advantage is execution plus contracted capacity

>2 GWof contracted generation capacity across three technology customers was described by management in April 2026, including the Stateline joint venture and two ten-year customer agreements.
Secure equipment
Turbines, reciprocating engines, and related generation assets must be ordered years ahead.
Engineer the site
Match load profile, redundancy, emissions controls, voltage, and distribution architecture.
Deploy and commission
Execution speed determines when contracted MW begin earning revenue.
Operate the asset
Uptime, maintenance, and fuel coordination protect lifecycle economics.
Earn contracted returns
Multi-year rent and service payments must exceed financing, depreciation, and operating costs.

The logistics advantage is installed know-how, not just hardware

Logistics remains strategically useful because Solaris designs and manufactures proprietary systems, supports them with field personnel and software, and has customer relationships across U.S. completions. Its moat is narrower than the emerging power opportunity, but the fleet is mature and requires relatively low maintenance capital. The company’s 2025 Form 10-K cites reliability, technical expertise, patent-protected logistics technology, service breadth, capacity, safety, reputation, experience, and price as competitive factors.

Contract visibilityStrong
Execution complexityHigh
Capital intensityVery high
Grid substitution valueStrong
Customer concentrationConcentrated
Legacy cash supportUseful

These ratings are an analytical synthesis of disclosed contracts, capital spending, customer concentration, and segment economics—not company-issued credit grades.

Who competes with Solaris, and where is its market position vulnerable?

Solaris’s primary power competitor is often the grid. Timely, reliable interconnection reduces the need for behind-the-meter capacity. Other alternatives include distributed-generation owners, rental fleets, microgrid developers, contractors, and customer self-builds. Logistics competes with equipment makers, pressure pumpers, sand miners, trucking providers, and integrated completion firms.

Competitive alternative Why a customer may choose it Solaris response
Utility grid Potentially lower long-run cost and no customer-owned generation complexity Faster time to power, redundancy, and bridge or permanent behind-the-meter solutions.
Large distributed-power providers Scale, equipment access, financing, or broader generation technology Integrated execution, customer-specific design, balance of plant, and long-term O&M.
Customer self-build Direct control and avoidance of third-party rent Transfer project execution, uptime, maintenance, and equipment-procurement risk to Solaris.
Integrated oilfield service firms Bundled pressure pumping, sand, transportation, and completion services Specialized, electric, automated proppant systems and operating support.

Where the position is strongest

Solaris is strongest when loads are large and urgent, grid access is delayed, and the customer wants one accountable provider. Long-term agreements can support financing, while GESA broadens the offer from asset rental to installation, commissioning, maintenance, repair, and third-party services.

Where the position can weaken

The position weakens if grid access improves, customers self-procure, alternatives become cheaper, or rivals secure scarce equipment first. Logistics also faces price pressure and customer consolidation; the same firms can be customers on one job and competitors on another.

Power market position
Speed + integration
Best suited to constrained-grid, mission-critical loads with long project lives.
Logistics market position
Specialization + installed base
Useful cash-generating niche, but exposed to oilfield cycles and integrated rivals.

How strong are cash flow, liquidity, and the capital structure?

Solaris is profitable, but its growth program consumes more cash than current operations produce. Q1 2026 operating cash flow was $79.0 million versus $343.4 million of capex, leaving a simple cash-flow-minus-capex deficit of $264.3 million. The gap reflects assets funded before commissioning and rental commencement.

Capital intensity is the defining financial constraint

Q1 2026 operating cash flow — $79.0M, equal to 23.0% of capex
Funding gap versus capex — $264.3M, 77.0%

At March 31, 2026, Solaris held $344.5 million of cash. It also reported $319.7 million of current long-term debt, $395.4 million of long-term debt, and $881.6 million of convertible notes. The debt stack had expanded through the $300 million bridge term loan, Genco-related financing, and Stateline borrowing. After quarter-end, the bridge commitment was increased by $200 million, and Stateline drew another $64.0 million.

Financial item Reported amount Period What it means
Cash and equivalents $344.5M March 31, 2026 Material liquidity, but small relative to the remaining build program.
Total assets $3.00B March 31, 2026 Up from $2.14B at year-end 2025 following acquisitions and fleet investment.
Debt plus convertible notes $1.60B March 31, 2026 Combines current and long-term debt with carrying value of convertibles.
Expected remaining 2026 capex $1.26B Company estimate in Q1 2026 10-Q Execution requires continuing access to cash, operating inflows, and financing.
Quarterly dividend $0.12/share Approved April 23, 2026 The June 2026 payment represented the 31st consecutive dividend.

Debt financing creates both runway and dilution sensitivity

At year-end 2025, Solaris had $902.5 million principal of convertibles: $155.0 million due 2030 at 4.75% and $747.5 million due 2031 at 0.25%. The larger note limits near-term interest but can dilute Class A holders; $65.6 million of capped calls partly mitigates that risk. A DCF must model deployment, debt service, conversion, and non-controlling interests explicitly.

Who owns Solaris, and how does governance shape decisions?

Solaris has Class A and Class B stock with one vote per share, but Class B has no direct economic rights and corresponds to Solaris LLC units. At the March 20, 2026 proxy record date, 58.1 million Class A and 15.3 million Class B shares were outstanding. The structure preserves original-investor voting influence.

Holder or group Reported position Combined voting power Why it matters
Yorktown Energy Partners X 7.08M Class B shares 9.6% Largest disclosed voting block in the 2026 proxy.
William A. Zartler 1.31M Class A and 4.24M Class B shares 7.6% Founder, Chairman, and Co-CEO retains meaningful alignment and influence.
KTR Management 2.00M Class B shares 2.7% Legacy MER-related ownership and related-party context remain relevant.
Golem International 3.15M Class A shares 4.3% Shares were issued as consideration in the March 2026 Genco acquisition.

These figures come from the 2026 proxy statement. Economic ownership and voting power should not be treated as identical because Class B shares are paired with LLC interests and carry voting but not direct economic rights.

Leadership combines founder continuity with power-market specialization

Founder Bill Zartler is Chairman and Co-CEO; Amanda Brock became Co-CEO and a director in October 2025. The leadership roster includes dedicated power executives. Concentrated leadership can speed decisions, making independent oversight especially important during a multibillion-dollar buildout.

What governance signals should researchers notice?

Classified board
Three director classes mean changing a board majority generally requires at least two annual meetings.
Lead independent director
Edgar Giesinger serves as the liaison for independent directors while the Chairman is also Co-CEO.
Performance-linked compensation
2025 incentives included EBITDA, free cash flow, utilized systems, market share, contract tenor, managed capacity, TSR, and safety.
Variable pay
Approximately 97% of Zartler’s 2025 target direct compensation and about 82% for other continuing named executives was variable.

Which opportunities, KPIs, and risks matter most?

AI power demand is rising faster than grid infrastructure in many locations. Solaris benefits if customers prioritize speed, contracted projects commission on schedule, and GESA converts deployments into recurring lifecycle services. Logistics can help fund growth when completion activity is healthy.

KPIs that connect operations to value

MW earning revenue
Track growth from the Q1 2026 average of 910 MW and compare it with installed and committed capacity.
Contracted MW and tenor
More than 2 GW was under long-term technology-customer arrangements in April 2026; duration determines cash-flow visibility.
Power EBITDA per MW
Shows whether new deployments preserve economics as project scale and equipment mix change.
Fully utilized logistics systems
Q1 2026 reached 104, but revenue must be analyzed with last-mile mix and per-system profitability.
Capex versus operating cash flow
The Q1 2026 gap was $264.3M; sustained gaps increase financing and dilution risk.
Customer concentration
At March 31, 2026, two customers represented 45% and 14% of trade receivables.
Commissioning schedule
Delayed turbines or site readiness postpone rent while financing costs continue.
Share count and NCI
Acquisition shares, convertible notes, LLC exchanges, and Stateline’s 49.9% partner affect per-share value.

Risks that could change the earnings path

Risk Transmission mechanism Metric to monitor
Project execution Late equipment, construction, permitting, or commissioning delays revenue recognition. MW placed in service versus announced schedule.
Capital and refinancing Higher rates or weak markets raise funding costs or require equity issuance. Cash, debt maturities, interest expense, capex commitments, share count.
Customer concentration A contract change, customer delay, or credit event can affect a large portion of projected cash flow. Top-customer revenue, receivables, deferred revenue, contract amendments.
Supplier concentration Long-lead turbines and electrical equipment may be unavailable or more expensive. Delivery dates, purchase commitments, vendor prepayments, capex inflation.
Grid and technology substitution Faster grid interconnection or superior alternatives reduce rental demand. New contract wins, renewals, pricing, customer self-build activity.
Oilfield cycle Lower commodity prices reduce completions, logistics utilization, and last-mile demand. Fully utilized systems, logistics revenue per system, customer budgets.
Integration and international expansion Genco, HVMVLV, Nova assets, and GESA add people, systems, jurisdictions, and execution complexity. Acquisition costs, margins, retention, service revenue, working capital.

The 2025 Form 10-K also flags regulation, tariffs, cybersecurity, weather, safety, patent protection, and reduced outsourcing. Secure, reliable operating technology is essential because customer economics depend on uptime.

What is the key analytical takeaway for valuation?

Solaris should be valued as a transitioning infrastructure platform. Key DCF inputs are deployment timing, revenue and EBITDA per MW, growth versus maintenance capex, financing costs, and non-controlling interests. Recognizing all announced capacity immediately overstates near-term cash flow; ignoring contracted backlog understates the platform.

Value-supporting case
Contracted scale
Projects commission broadly on schedule, uptime is high, lifecycle services expand, and long-term technology customers honor commitments.
Value-pressure case
Funding + delay
Capex overruns, delayed MW, customer concentration, or expensive refinancing reduce free cash flow and increase dilution.

How should a DCF treat the transition?

  • Build capacity by cohort. Separate operating, construction-stage, and ordered MW.
  • Separate segments. Model Power from contracts and assets; model Logistics from utilization and service mix.
  • Model financing explicitly. Include debt, convertibles, capped calls, acquisition shares, and LLC exchanges.
  • Split growth and maintenance capex. Expansion spending should fade, while fleet maintenance rises.
  • Use attributable economics. Stateline is consolidated, but 49.9% belongs to its customer partner.
Final synthesis
Solaris has moved from specialized logistics into a contracted distributed-power platform for AI data centers and energy customers. Q1 2026 showed Power Solutions dominating growth and segment EBITDA; the 3.1 GW plan and GESA broaden the opportunity. The vulnerability is that capital spending arrives before all assets earn cash. The decisive test is whether Solaris can procure, finance, commission, operate, and refinance the fleet on schedule while protecting per-share economics. Monitor earning MW, contract tenor, EBITDA per MW, funding, concentration, and dilution together—not headline capacity alone.

DCF model

    5-Year Financial Model

    40+ Charts & Metrics

    DCF & Multiple Valuation

    Free Email Support



Disclaimer

All information, articles, and product details provided on this website are for general informational and educational purposes only. We do not claim any ownership over, nor do we intend to infringe upon, any trademarks, copyrights, logos, brand names, or other intellectual property mentioned or depicted on this site. Such intellectual property remains the property of its respective owners, and any references here are made solely for identification or informational purposes, without implying any affiliation, endorsement, or partnership.

We make no representations or warranties, express or implied, regarding the accuracy, completeness, or suitability of any content or products presented. Nothing on this website should be construed as legal, tax, investment, financial, medical, or other professional advice. In addition, no part of this site—including articles or product references—constitutes a solicitation, recommendation, endorsement, advertisement, or offer to buy or sell any securities, franchises, or other financial instruments, particularly in jurisdictions where such activity would be unlawful.

All content is of a general nature and may not address the specific circumstances of any individual or entity. It is not a substitute for professional advice or services. Any actions you take based on the information provided here are strictly at your own risk. You accept full responsibility for any decisions or outcomes arising from your use of this website and agree to release us from any liability in connection with your use of, or reliance upon, the content or products found herein.